Option 1
Antea Cement (Titan Group)
Length (half-day)
Travel distance from Tirana – 50 km
Schedule
subject to change
08.30 Departure from Maritim Hotel Plaza Tirana, Rruga Abdi Toptani 18, Tirana.
09:00 Arrival at Elbasan Ferro-Chrome factory. Introduction to the company. Health & Safety instructions.
09.30 Factory tour
11.00 Departure to Tirana
11:30 Arrival to Maritim Hotel Plaza Tirana
Brief
Ferro-Chrome factory of Elbasan factory started to operate in 1989. It is designed to produce high-carbon ferrochrome using as raw chromium material coming from the mines in the country, mainly from Bulqiza area. Currently, Ferro-Chrome Factory of Elbasan works with two furnaces for the production of high-carbon ferrochrome. One of the furnaces was introduced into production in early May 2013, after an investment of Balfin Group. The current production capacity is about 33'000 tons of ferrochrome per year. This product is entirely destined for export, mainly to the markets of developed industrial countries in Europe, Asia and America.
Albchrome is the largest chrome ore and high-carbon ferrochrome producer in Albania. The company has the capacity to produce 72,000 tons of high carbon ferrochrome annually and owns more than 2 million tons of high-grade chrome ore reserves. Founded in 1991 as a state company, Albchrome has one of the largest licenses to Europe’s chromium deposits and exports ferrochrome to more than 50 countries. The chrome ore mine in Bulqiza has 38-44% grade chrome ore, and 2 ferrochrome plants in Burrel and Elbasan have a total of 4 production furnaces.
In early 2022 Albchrome became part of Yilmaden Holding, YILDIRIM Group’s metals and mining subsidiary, which is ranked as the 2nd largest high-quality high carbon ferrochrome producer, and the 4th largest chromium company in the World.
After the acquisition of AlbChrome, YILDIRIM is committed to upgrading the company by transferring its technology and know-how, continuing investments to grow the capacity, and improving global sales of Albchrome.
Schedule
subject to change
12.30 Departure from Maritim Hotel Plaza Tirana, Rruga Abdi Toptani 18, Tirana.
13.00 Arrival at Antea Cement. Introduction to the company. Health & Safety instructions.
13.30 Site visit to a quarry to see closely mining activities and the rehabilitated area.
15.00 Departure to Tirana
15:30 Arrival to Maritim Hotel Plaza Tirana
Brief
ANTEA Cement has a production capacity of 1.4-million-ton cement yearly and 3.300-ton clinker per day. The plant is located at Boka e Kuqe, Borizane which is 50 km away from Tirana. It is the largest industrial greenfield investment (total value exceeding 200 million Euro) in Albania. To ensure energy efficiency and environmental effectiveness, the plant uses closed storage for over 100.000 tons of raw materials, and all transportation of materials within the plant is via covered conveyors to decrease fugitive dust. The latest technology with vertical grinding mills is being used, ensuring better environmental performance and higher efficiency in electricity consumption. ANTEA uses bag filters which although have higher operational cost guarantees better environmental performance









